Contributing to society’s transition with renewable electricity
Bravida has been commissioned to carry out maintenance and
inspection work at eight of Energinet’s offshore facilities. This work
includes the offshore facilities’ high voltage systems, secondary
electrical systems, cooling and HVAC systems and sprinkler systems.
Renewable electricity all the way home
The facilities gather electricity from nearby offshore wind farms and
convert the electricity from the wind turbines into a higher voltage
level – from 33 kV to 132/220 kV – which is high enough to be trans
mitted to shore via the transmission grid. In this way Bravida’s work
helps ensure that the renewable electricity from offshore wind farms
reaches all the way into people’s homes.
Careful planning and preparation
As the work is taking place at sea, it is associated with a level of com
plexity that requires careful planning and preparation, for example if
access to the platforms is via helicopter or boat. The fact that Bravida
was awarded the contract proves that we are a valued partner
in large and advanced infrastructure projects.