The historic moving of Kiruna church, made possible by Bravida

The historic moving of Kiruna church, made possible by Bravida

The historic moving of Kiruna church, made possible by Bravida

Bravida is responsible for dismantling, preserving and preparing the technical infrastructure for reinstallation, which will begin in 2026.

Careful dismantling

Before the move, Bravida dismantled all the technology in the church, ranging from electrical installations to HVAC systems, with the utmost care. The work was carefully documented and carried out in close collaboration with Historiska Hus, Veidekke and LKAB.

In 2026, Bravida will install new technology, including new fire alarms, access control systems, alarm systems, lighting and heating solutions. The technology spaces are located in the new basement level, where electricity, heating, plumbing and ventilation are brought together to ensure modern operation while preserving the required cultural-historical character of the building.

Reuse promotes sustainability and underpins expression

The project has imposed high requirements regarding technology and feeling. Much of the material has been reused, both for sustainability reasons and to preserve the original look of the building. Among other things, various luminaires, pipes and heating elements have been retained in the pews.

Linkedin
Follow Bravida Group on LinkedIn